Source-site concept
Bottling at the source.
Historical plans describe a smaller bottling facility at Polichno, bringing the source and a filling operation together.
Proposed development
Natural water. Central Slovakia.
A natural groundwater source in the heart of Slovakia. A fresh vision for bottling, development and partnership.
In the highlands of central Slovakia, the AquaPol story begins deep beneath the surface.
AquaPol was established in Slovakia in 1996 to develop the Polichno groundwater resource. Four source wells near Lučenec underpin the vision for source-site bottling and a wider production connection.
An illustrated journey from rainfall to an underground reservoir.
Rain enters the ground, starting its journey beneath the highland landscape.
In this conceptual illustration, water passes through volcanic rock before granite bedrock redirects it towards permeable limestone.
The journey leads to an underground reservoir, the starting point for AquaPol’s development vision.
The water profile
The character of the water is part of the story.
Historical analyses describe a magnesium bicarbonate water profile. Explore the recorded water-quality measurements below.
For source analyses, technical information and a closer look at the project, let’s talk.
Get in touchExplore the source’s recorded composition and microbiology.
| Parameter | Reported value | Unit |
|---|---|---|
| Microbiology | ||
| Faecal coliform bacteria | 0 | KTJ/100mL |
| Enterococcus bacteria | 0 | KTJ/100mL |
| Psychrophilic bacteria | 0 | KTJ/100mL |
| Chemical composition | ||
| Arsenic | 0.0009 | mg/L |
| Cadmium | 0.0001 | mg/L |
| Lead | 0.0017 | mg/L |
| Free NH₃ ions | 0 | mg/L |
| Nitrates | 3 | mg/L |
| Nitrites | 0.02 | mg/L |
| Calcium | 21.6 | mg/L |
A source-site bottling concept and a proposed connection to a larger facility near Lučenec.
Source-site concept
Historical plans describe a smaller bottling facility at Polichno, bringing the source and a filling operation together.
Proposed development
Lučenec concept
A larger facility near Lučenec, linked by a proposed water pipeline of approximately 24 km. Planning also explores rail-connected logistics.
We welcome discussions about strategic partnerships, joint ventures and phased development, from source-site bottling to a wider production and logistics concept.
Get in touch
For project information and partnership enquiries, start a conversation with us.
Get in touch